Skip to content
GES, Geometric Eye Structure

Bridge engineering

Bridge Sir El Donnyeh, Qosaita & Bqarsona

This project had 3 main challenges to overcome: balancing the weight of the bridge in mid-air, the variation of the post-tension cable installation according to the construction phases, and finally the middle span, which is much longer than the adjacent spans.

Area
Not specified
Year
Not specified
Scope
Not specified
Location
Not specified

The Project

What?

This project had 3 main challenges to overcome: balancing the weight of the bridge in mid-air, the variation of the post-tension cable installation according to the construction phases, and finally the middle span, which is much longer than the adjacent spans.

How?

Backfill was placed as a counterweight in the back spans in closed sections. 48 cables were installed to retain the segments in the first stage, then 8 cables were added once the 2 bridges were linked in the middle, and finally continuous cables were installed from the beginning to the end of the bridge.

  • Bridge Sir El Donnyeh, Qosaita & Bqarsona, image 2
  • Bridge Sir El Donnyeh, Qosaita & Bqarsona, image 3
  • Bridge Sir El Donnyeh, Qosaita & Bqarsona, image 4
  • Bridge Sir El Donnyeh, Qosaita & Bqarsona, image 5

Next Project

RF NGO — Children Angels of Earth

Let's Build Together

Turning vision into reality